Walnut Creek , CA
New interior improvements
in new building shell
Features, Methods and Challenges included:
- Very tight site conditions on the main artery
through the downtown Walnut Creek shopping area
- Stained Concrete Floor required protection
throughout construction
- Substantial seismic bracing was required
by City of Walnut Creek for all lighting fixtures
- This was a tenant improvement in a pre-cast
building shell built by others
|